Specialized engineers working now at ASSAIL PLAST factory for installed the internal cooling system of the factory, and
also the installation of electrical systems.
The work includes: Installation, Extend connections, Linking the internal network, Preparation and distribution of
Machinery and processed with the necessary extensions.